My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-03-18_REVISION - M1994114
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994114
>
2015-03-18_REVISION - M1994114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:25 PM
Creation date
3/19/2015 9:19:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994114
IBM Index Class Name
REVISION
Doc Date
3/18/2015
Doc Name
Second Adequacy Review CN01
From
DRMS
To
Any Kagan, Ken Klco
Type & Sequence
CN1
Email Name
TOD
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kagan &Son, L.L.C. <br />March 18, 2015 <br />Page 2 of 2 <br />General Questions and Comments <br />25) The Mining operation is broken into 3 main phase. It is DRMS's understanding that the <br />Operator is requesting to have a "floating bond" meaning the Operator will have no more <br />than 10 acres disturbed at any one time. The ten acres of disturbance will float throughout <br />the phases with ongoing concurrent reclamation. Therefore, this is not phased bonding <br />approach; the floating 10 -acre floating bond will cycle throughout the phases with <br />concurrent reclamation. The Phase numbers on Mine Plan Map, correspond with the <br />planned direction of mining. DRMS has calculated the required Financial Warranty for <br />this operations 10 -acre floating bond. The required Financial Warranty for this operation <br />will be set at $36,250, please see the enclosed Financial Warranty Calculation. <br />This concludes the Division's preliminary adequacy review of this application. This letter shall not be <br />construed to mean that there are no other technical deficiencies in your application. Other issues may arise <br />as additional information is supplied. The decision date for this conversion application is March 23, 2015. <br />As previously mentioned, if you are unable to provide satisfactory responses to any inadequacies prior to <br />this date, it will be your responsibility to request an extension of time to allow for continued review of this <br />application. If there are still unresolved issues when the decision date arrives and no extension has been <br />requested, the application will be denied. <br />If you need additional information please contact me at the Division of Reclamation, Mining and Safety, <br />1313 Sherman St., Room 215, Denver, CO 80203, by telephone at 303 - 866 -3567, extension 8131, or by <br />email at Tyler.ODonnell(c ) state.co.us. <br />Sincerely, <br />°Y Or lL <br />Tyler O'Donnell <br />Environmental Protection Specialist <br />Enclosures: Financial Warranty Calculation <br />cc: Tom Kaldenbach, DRMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.