Mr. Dick Wolfe, P.E., <br />October 8, 2014 <br />Page 3 <br />Dust Control <br />Water used by AFS for dust suppression on the Worthing site is taken from the exposed ground <br />water in the Worthing Pit utilizing temporary pumping equipment. Dust suppression at the <br />Worthing Pit is estimated to be approximately 1.0 acre -feet through May 2015 (see Table 2). <br />Pumping from the Worthing Pit for the purpose of dust suppression will not occur beyond May <br />of 2015. A well permit for the Worthing Pit (Permit No. 76903 -F) was obtained in December <br />2012 as part of the SWSP renewal process. The use of pumping equipment in the Worthing Pit <br />was approved in a January 17, 2013 letter written by Mathew A. Sares pursuant to a request for <br />variance submitted by AFS (Request No: 2013- 004A). <br />Total Demand <br />As shown in Table 2, the total estimated 2015 water demand at the Worthing Pit associated with <br />evaporation and dust suppression is 1.64 acre -feet. <br />B. DEPLETIONS <br />Depletions at the site do not hit the river instantaneously and must therefore be lagged back to <br />the river. AFS estimated the lagged depletions from the 2015 plan year as well as the post -plan <br />year depletions associated with the 2014 Plan using the IDS Alluvial Water Accounting System <br />(AWAS). The distance between the exposed water at the Worthing Pit and the South Platte <br />River edge is 437 feet as measured from the centroid of the lake. AFS estimated the alluvial <br />aquifer transmissivity to be 100,000 gpd/ft with a specific yield of 0.2. A summary of the <br />AWAS input parameters used in the model are shown in Table 3. <br />Lagged Depletions <br />The AWAS analysis indicated that the Post -plan depletions associated with AFS's use during the <br />2014 Plan (i.e., 16.02 acre -feet) were 0.32 acre -feet occurring within the first three months of <br />2015. The estimated schedule of depletions resultant to the 2015 plan year water use of 1.64 <br />acre -feet as well as the post -plan depletions from 2014 is summarized in the attached Table 4. <br />There are no lagged depletions that last beyond the 2015 Plan Year. <br />Total 2014 Plan Year Depletions Requiring Replacement <br />The monthly replacements required by AFS in 2015 are summarized Table 5. The 2015 <br />replacement requirements include post -plan depletions from 2014 (i.e., 0.32 acre -feet) and the <br />depletions associated with 2015 water usage (i.e., 1.64 acre - feet). The delivery point for <br />augmentation water is located approximately 12.0 miles upstream of the mining operation. <br />Transit loss is estimated at 0.5 percent per mile, resulting in a 6.0 percent overall transit loss. <br />AFS calculates a total 2015 plan year replacement requirement, including transit loss, of 2.07 <br />acre -feet (see Table 5). <br />