My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-23_REVISION - M1977526
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977526
>
2015-02-23_REVISION - M1977526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:13 PM
Creation date
2/25/2015 9:16:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977526
IBM Index Class Name
REVISION
Doc Date
2/23/2015
Doc Name
Adequacy Response #2 TR04
From
Environment, Inc
To
DRMS
Type & Sequence
TR4
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Dick Wolfe, P.E., <br />October 8, 2014 <br />Page 2 <br />NARRATIVE DESCRIPTION <br />A. PROJECT DESCRIPTION <br />The Worthing Pit is located in Section 26, Township 1 South, Range 67 West in Adams County, <br />Colorado as shown on Figure 1. The Worthing Pit began operation in 1977 and is currently <br />permitted under Division of Reclamation and Mining Safety Permit M- 1977 -526. Active mining <br />activities at the pit are complete. The original permit area was 111 acres. In November 28, <br />2000, a Technical Revision to the permit (TR -2) authorized dewatering and dry mining of the pit <br />lakes at the Worthing Pit. In 2005, Permit M- 1977 -526 was amended to add 50.3 acres to the <br />mine boundary of the Worthing Pit. The exposed water surface area prior to January 1, 1981 is <br />shown on Photograph 1 (dated June 4, 1980). Figure 2 shows the exposed water surface as of <br />February 21, 2012. A typical cross section is provided in Figure 3. The final reclamation map <br />is Figure 4. <br />Based on a February, 21, 2012 aerial photograph of the Worthing site, there was 32.11 acres of <br />exposed groundwater remaining after active mining activity ceased. As part of the approval <br />process of previous Worthing Pit SWSPs, and pursuant to §37- 90- 137(11)(b), C.R.S., it was <br />determined that 28 acres of the 32.11 acres was to be considered pre -81 acreage and therefore <br />exempt from evaporative replacement requirements. In the previous SWSPs, AFS replaced the <br />evaporative depletions associated with the 4.11 acres (32.11 — 28 = 4.11) of post -80 groundwater <br />exposure. However, as part of the ongoing reclamation work in 2014, AFS backfilled 3.38 acres <br />of the post -80 water surface area. The post -80 area that was backfilled to eliminate the exposure <br />of ground water was surveyed and is shown in Figure 5. <br />Need and Use of Water <br />AFS expects to backfill the remaining 0.73 acres (4.11 — 3.38 acres) of post -80 water surface in <br />late 2014 and early 2015. It is AFS's intention to have completed the backfilling operation prior <br />to June 2015. Therefore, the estimated 2015 plan year water requirements for the Worthing Pit <br />are those associated with the evaporative losses from the 0.73 acres of post -80 exposed ground <br />water and the water needed for dust suppression during processing of Stagecoach Stop Pit <br />material at Worthing Pit for January through May of 2015. Estimates of the 2015 depletions and <br />replacement requirements are summarized in the following subsections and tables. <br />Evaporative Loss <br />Gross evaporation at this site is estimated to be 45 inches (3.75 feet) per year with an effective <br />precipitation amount of 0.83 feet. This equates to a total evaporative loss of 0.64 acre -feet for <br />0.73 acres of post -80 water surface area for the first five months of 2015 (see Table 1). AFS <br />will continue to replace groundwater depletions at Worthing Pit associated with evaporation until <br />backfilling of all post -80 groundwater is completed and AFS submits proof that no more than <br />28.0 acres of exposed groundwater exists. As previously mentioned, AFS fully expects to have <br />all post -80 exposed groundwater backfilled by no later than May 2015. <br />
The URL can be used to link to this page
Your browser does not support the video tag.