Laserfiche WebLink
Site 08 <br />Install steel pine collar on existing well (SF87 -09) <br />This task involved placing a steel pipe over the existing pipe and filling the void between the two <br />pipes with mortar mix and then pouring a small cement base for support of the pipes above the <br />soil surface. A lockable cap was then placed on the pipe after this photograph was taken. Seed <br />mix was hand scatted at this site around the pipe and tamped into the soil. This work was <br />completed on November 10, 2014. <br />a <br />Figure 9a. Steel pipe installed on SF87 -09. Work completed on November 10, 2014. <br />10 <br />