Laserfiche WebLink
Site 09 <br />This site was a result of erosion along an old road. The erosion created a small head -cut that had <br />eroded soil and sediment exposing some buried PVC pipes. The soils that had been eroded from <br />this ditch area were replaced with sediments collected downslope using a Bobcat with a bucket. <br />The fill material was packed with the equipment and then reseeded. The soil and seed were then <br />raked and tamped. Small diameter woody stems were placed about 10 feet apart on the contour <br />of the slope for the length of this area in an attempt to slow any water flow across this area. In <br />addition, a water bar was placed at the upper end of this ditch to reduce water flow at this <br />location until the area is revegetated. <br />This work was completed on November 1 and November 19, 2014. The seed mix was applied to <br />the areas that were refilled and to the area where the sediment was excavated to fill the gully. <br />This gully area was about 500 ft2 in size. The approved seed mix used can be seen in Table 2. <br />A <br />rwwr.. <br />. 4r�.- r�+►•. µ -., mow. - ...� <br />181 <br />Figure 10a and 10b. The left photograph shows the upper end of the erosion gully where the <br />PVC pipes were exposed. These areas were refilled and reseeded; the completed task is viewed <br />in the right photograph. <br />11 <br />