Laserfiche WebLink
amec <br />foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement; SF, SSF, UD, and SLF sampling; clearing and grubbing; underground working <br />remediation and confirmatory drilling; topsoil removal; and <br />II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to AM EC's laboratory for analysis: <br />Soil Liner Fill Sample SLF169 -C (Control sample) <br />3= Structural Fill Sample SF113 -R (Record sample) <br />➢ Underdrain Fill Sample 2UF2 -R (Record sample) <br />Select Structural Fill Sample 2SSF1 -R (Record sample) <br />General Project Items <br />Meetings and Discussions: <br />:- The Weekly Contractor Meeting was held January 7, 2015 (AMEC, CC &V, Ames) <br />'r Ames daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC &V <br />Projects, AMEC, and Ames. <br />Miscellaneous: None. <br />Deliveries: None. <br />Submitted by: Eric Lorenson <br />Reviewed by: J —�T <br />Tim Burkhard <br />Project Resident <br />Phone: 719 - 689 -2986 <br />CC &V Projects �- <br />Reviewed By: <br />Reviewed By: <br />Date: January 21, 2015 <br />Date: January 21, 2015 <br />Date: ) z i , <br />Date: <br />201501- 10-rrde2 weekly final- rt.docx Page 3 off <br />