My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-28_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-01-28_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:58 PM
Creation date
2/13/2015 3:21:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/28/2015
Doc Name
Weekly Construction Quality Assurance Report
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�s> <br />amec <br />foster <br />wheeler <br />for structural fill. <br />Haul truck ramp construction occurred on the west side of Dump 4 downslope of stations N6 +00 <br />to N8 +00 in Phase 2. Material was dozed down from the dump and placed as structural fill for the <br />ramp construction per project specifications. <br />Phase 1 subgrade slope rough grading occurred downslope of stations L4 +00 to L10 +00 and <br />downslope of C0 +00 to C4 +00. <br />Phase 2 subgrade slope rough grading occurred downslope of stations M28 +00 to M32 +00. <br />Spent Ore: <br />Mine Operations hauled spent ore to the PSSA in Cat 777 haul trucks. The material was placed <br />using a Cat dozer. <br />Subgrade: Phase 1 rough subgrade prep occurred and base topography of Phase 2 areas <br />occurred during this reporting period after clearing and grubbing was completed. <br />The subgrade was approved in Phase 1 between approximate stations F10 +00 to F12 +00 and <br />the SGVLF haul road stations 25 +00 to 30 +00 adjacent to previously approved subgrade to the <br />west. See the attached figure for approved subgrade locations. <br />Soil Liner Fill (SLF): (Placement Operations Temporarily Suspended) <br />Cat 777 haul trucks transported SLF from the Cameron area to the Phase 1 stockpile below <br />stations F0 +00 to F10 +00. <br />Cameron Site: SLF processing continued at the Cameron Site. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: Approximately 555 feet of secondary underdrain was installed in <br />Phase 2 below station 19 +00. <br />Tertiary Underdrain: No work was performed during this reporting period. <br />Leak Detection: No work was performed during this reporting period. <br />13) Underground Workings: <br />Confirmatory drilling occurred at working #6010. Additional drilling and remediation is required. <br />A Cat excavator and a dozer removed shot rock from working #6631 for geogrid placement. <br />C) Geomembrane: <br />Phase 1 80 -mil DSMS LLDPE Liner Installation: (Installation is suspended at this time.) <br />D) Drain Cover Fill (DCF) (Placement operations suspended at this time.) <br />E) High Volume Solution Collection System Piping (HVSCS): <br />No work was performed during this reporting period. <br />II) Storm Water Management <br />Best Management Practices (BMPs) are being performed. <br />2015- 01- 10 -mle2 weekly final- rt.docx Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.