My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-28_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-01-28_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:58 PM
Creation date
2/13/2015 3:21:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/28/2015
Doc Name
Weekly Construction Quality Assurance Report
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 38 °F to 46 °F Cloud Cover: Partly cloudy <br />Lows: 15 °F to 31 OF Precipitation: Snow on Sunday <br />Wind: Variable <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF) <br />Planning: Continuing construction activities and scheduling for the VLF <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Topsoil /Overburden Stripping: <br />Topsoil was stripped near station K8 +00 and stockpiled for later removal. <br />Tree Grubbing and Clearing, Chipping: <br />Tree removal occurred in Phase 2 near station K10 +00. Tree stumps (root balls) and slash were <br />hauled and piled upslope of Phase 2 Diversion Channel north of station 38 +00, outside the <br />Phase 2 limits. <br />Production Drilling: None. <br />Production Blasting: None. <br />Structural Fill: <br />An AMEC field professional monitored fill material temperatures during fill placement. Average <br />structural fill temperatures were above 32 °F. Snow was removed from areas prior to fill <br />placement. All construction materials placed were verified as suitable, and construction methods <br />were in accordance with project technical specifications. <br />Material hauled from the Surge area was placed and compacted as structural fill per project <br />specification between L5 +00 to L10 +00 in Phase 1 and M22 +00 and M40 +00 in Phase 2. A Cat <br />330C excavator with a hammer attachment broke oversize material to meet project specifications <br />2015 -01- 10 -mle2 weekly final - rl.docx Page 1 of 6 <br />Days <br />S <br />I M <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. amec <br />I W <br />ANGLOGOLD ASHANTI (COLORADO) <br />foster <br />S <br />SQUAW GULCH (VLF) WEEKLY REPORT <br />wheeler <br />Owner: <br />Cripple Creek & Victor Gold Mining Co. Project Number: <br />74201125NO <br />Project: <br />Squaw Gulch Valley Leach Fill (VLF) Week Ending: <br />January 10, 2015 <br />Location: <br />Cripple Creek & Victor Gold Mine, CO <br />N <br />Contractor: <br />Ames Construction, Inc. <br />N <br />N <br />Reporting Period: 1.3.2015 through 1.10.2015 <br />D =Day Shift N =Night Shift W= Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 38 °F to 46 °F Cloud Cover: Partly cloudy <br />Lows: 15 °F to 31 OF Precipitation: Snow on Sunday <br />Wind: Variable <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF) <br />Planning: Continuing construction activities and scheduling for the VLF <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Topsoil /Overburden Stripping: <br />Topsoil was stripped near station K8 +00 and stockpiled for later removal. <br />Tree Grubbing and Clearing, Chipping: <br />Tree removal occurred in Phase 2 near station K10 +00. Tree stumps (root balls) and slash were <br />hauled and piled upslope of Phase 2 Diversion Channel north of station 38 +00, outside the <br />Phase 2 limits. <br />Production Drilling: None. <br />Production Blasting: None. <br />Structural Fill: <br />An AMEC field professional monitored fill material temperatures during fill placement. Average <br />structural fill temperatures were above 32 °F. Snow was removed from areas prior to fill <br />placement. All construction materials placed were verified as suitable, and construction methods <br />were in accordance with project technical specifications. <br />Material hauled from the Surge area was placed and compacted as structural fill per project <br />specification between L5 +00 to L10 +00 in Phase 1 and M22 +00 and M40 +00 in Phase 2. A Cat <br />330C excavator with a hammer attachment broke oversize material to meet project specifications <br />2015 -01- 10 -mle2 weekly final - rl.docx Page 1 of 6 <br />Days <br />S <br />I M <br />T <br />I W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D <br />D <br />N <br />N <br />N <br />N <br />N <br />D =Day Shift N =Night Shift W= Weather <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs: 38 °F to 46 °F Cloud Cover: Partly cloudy <br />Lows: 15 °F to 31 OF Precipitation: Snow on Sunday <br />Wind: Variable <br />Ames: Continuing construction tasks for the Valley Leach Facility (VLF) <br />Planning: Continuing construction activities and scheduling for the VLF <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />1) Earthworks <br />A) VLF (PSSA, Phase 1, and 2) <br />Topsoil /Overburden Stripping: <br />Topsoil was stripped near station K8 +00 and stockpiled for later removal. <br />Tree Grubbing and Clearing, Chipping: <br />Tree removal occurred in Phase 2 near station K10 +00. Tree stumps (root balls) and slash were <br />hauled and piled upslope of Phase 2 Diversion Channel north of station 38 +00, outside the <br />Phase 2 limits. <br />Production Drilling: None. <br />Production Blasting: None. <br />Structural Fill: <br />An AMEC field professional monitored fill material temperatures during fill placement. Average <br />structural fill temperatures were above 32 °F. Snow was removed from areas prior to fill <br />placement. All construction materials placed were verified as suitable, and construction methods <br />were in accordance with project technical specifications. <br />Material hauled from the Surge area was placed and compacted as structural fill per project <br />specification between L5 +00 to L10 +00 in Phase 1 and M22 +00 and M40 +00 in Phase 2. A Cat <br />330C excavator with a hammer attachment broke oversize material to meet project specifications <br />2015 -01- 10 -mle2 weekly final - rl.docx Page 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.