My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-28_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2015-01-28_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:58 PM
Creation date
2/13/2015 3:21:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/28/2015
Doc Name
Weekly Construction Quality Assurance Report
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />AMEC - 2015 CQA Field Staff Schedule MLE2 <br />amec <br />foster <br />wheeler <br />Name <br />Sun. <br />Mon. <br />Tues. <br />Wed. <br />Thurs. <br />Fri. <br />Sat. <br />Jan.4 <br />Jan.5 <br />Jan.6 <br />Jan.7 <br />Jan.8 <br />Jan.9 <br />Jan. 10 <br />Tim Burkhard <br />PR <br />PR <br />PR <br />PR <br />PR <br />Ben Melly <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Steve Rice <br />UG <br />UG <br />UG <br />UG <br />UG <br />Robert Redd <br />UG <br />UG <br />UG <br />UG <br />UG <br />Tyler Browning <br />GT <br />GT <br />GT <br />GT <br />Eric Lorenson <br />ST <br />ST <br />ST <br />ST <br />Denis Koval <br />ST <br />ST <br />ST <br />ST <br />Rick Buxton <br />ST <br />Razi Molloy <br />LT <br />LT <br />LT <br />LT <br />LT <br />LEGEND: <br />PL = Project Lead <br />PM = Project Manager <br />PCE = Project Certifying Engineer <br />PE = Project Engineer <br />PR = Project Resident <br />LG = Lead Geosynthetics Engineer <br />LS = Lead Soils Technician <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GL = Geosynthetics Lead <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />GS = Geophysics Survey Geologist <br />HY = Highway Design Engineer <br />2015 -01- 10 -mle2 weekly final - rl.docx Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.