Laserfiche WebLink
ATTACHMENT A <br />AMEC - 2015 CQA Field Staff Schedule MLE2 <br />amec <br />foster <br />wheeler <br />Name <br />Sun. <br />Mon. <br />Tues. <br />Wed. <br />Thurs. <br />Fri. <br />Sat. <br />Jan.4 <br />Jan.5 <br />Jan.6 <br />Jan.7 <br />Jan.8 <br />Jan.9 <br />Jan. 10 <br />Tim Burkhard <br />PR <br />PR <br />PR <br />PR <br />PR <br />Ben Melly <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Steve Rice <br />UG <br />UG <br />UG <br />UG <br />UG <br />Robert Redd <br />UG <br />UG <br />UG <br />UG <br />UG <br />Tyler Browning <br />GT <br />GT <br />GT <br />GT <br />Eric Lorenson <br />ST <br />ST <br />ST <br />ST <br />Denis Koval <br />ST <br />ST <br />ST <br />ST <br />Rick Buxton <br />ST <br />Razi Molloy <br />LT <br />LT <br />LT <br />LT <br />LT <br />LEGEND: <br />PL = Project Lead <br />PM = Project Manager <br />PCE = Project Certifying Engineer <br />PE = Project Engineer <br />PR = Project Resident <br />LG = Lead Geosynthetics Engineer <br />LS = Lead Soils Technician <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GL = Geosynthetics Lead <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />UG = Underground Working Remediation <br />SE = Senior Engineer <br />GS = Geophysics Survey Geologist <br />HY = Highway Design Engineer <br />2015 -01- 10 -mle2 weekly final - rl.docx Page 4 of 6 <br />