Weekly Construction Quality Assurance Report
From
Cripple Creek & Victor Gold Mining Company
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />foster <br />wheeler <br />330C excavator with a hammer attachment broke oversize material to meet project specifications <br />for structural fill. <br />Phase 1 subgrade slope rough grading occurred downslope of Bench L stations L4 +00 to L10 +00 <br />upslope and downslope of Bench C stations C0 +00 to C4 +00. <br />Phase 2 subgrade slope rough grading occurred downslope of Bench M stations M28 +00 to <br />M32 +00. <br />Spent Ore: <br />Mine Operations hauled spent ore to the PSSA in Cat 777, 785, and 793 haul trucks. The <br />material was placed in the PSSA using a Cat dozer. <br />Subgrade: Phase 1 and 2 rough subgrade preparation occurred. No additional subgrade was <br />approved during this reporting period. <br />Soil Liner Fill (SLF): (Placement Operations Temporarily Suspended) <br />Cameron Site: SLF processing continued at the Cameron Site. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No work was performed during this reporting period. <br />Tertiary Underdrain: No work was performed during this reporting period. <br />Leak Detection: No work was performed during this reporting period. <br />B) Underground Workings: <br />Underground working numbers #6362, #6364, #6591, #6592, #6595, #6596, #6599, #6620, and <br />#6654 were excavated to competent rock, backfilled per project specifications, and are <br />considered remediated. <br />Confirmatory drilling and blasting occurred at working #6010. Additional remediation is required. <br />On January 15, underground workings #6590, #6593, and #6594 (all shafts) were excavated to <br />approximately 25 feet. The bottoms were not encountered. Drill access will be provided. Further <br />remediation is required. <br />C) Geomembrane: <br />Phase 1 80 -mil DSMS LLDPE Liner Installation: (Installation is suspended at this time.) <br />D) Drain Cover Fill (DCF) (Placement operations suspended at this time.) <br />E) High Volume Solution Collection System Piping (HVSCS): <br />No work was performed during this reporting period. <br />II) Storm Water Management <br />Best Management Practices (BMPs) are being performed. <br />201 M1 -17 -mW weekly f nal.docx Page 2 of 6 <br />