Laserfiche WebLink
M <br />amec <br />foster <br />wheeler <br />CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement-, SLF sampling,- clearing and grubbing; underground working remediation and <br />confirmatory drilling-, topsoil removal; and spent ore placement in the PSSA. <br />11) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Soil Liner Fill Sample SLF170 -C (Control sample) <br />General Project Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held January 14, 2015 (AMEC, CC &V, Ames) <br />Ames daily safety meetings <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC &V <br />Projects, AMEC, and Ames. <br />Miscellaneous: None. <br />Deliveries: None. <br />Submitted by: Eric Lorenson <br />Reviewed bye `' <br />Tim Burkhard <br />Project Resident <br />Phone: 719 - 689 -2986 <br />CC &V Projects <br />Reviewed By: <br />Reviewed By: <br />Date: January 21, 2015 <br />Date: January 21, 2015 <br />Date: / /z11 S <br />Date: / 2 2 -Ir_ <br />c <br />2015- 01- 17 -mle2 weekly final.doc Page 3 of 5 <br />