My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-04_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2015-02-04_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:14 PM
Creation date
2/4/2015 2:07:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
2/4/2015
Doc Name
Memo Regarding Bond Held Corrected & Cost Summary
From
Janet Binns
To
Rob Zuber
Type & Sequence
RN6
Email Name
JHB
RDZ
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 51 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile to Refuse Pile <br />Site: Southfield Mine Permit Action: RN6 Permit/Job #: C1981014 <br />PROJECT IDENTIFICATION <br />Task #: 011 State: Colorado <br />Date: 8/1/2014 County: Fremont <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 627G <br />- Dozer: NA <br />Abbreviation: None <br />Filename: C014 -011 <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker. 2.500 Gal. <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br />Total work team cost/hour: $707.46 <br />MATERIAL OUANTITIES <br />Initial volume: 17,100 CCY Swell factor: 1.125 <br />Loose volume: 19,238 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$72.62 <br />NA <br />NA <br />NA <br />$42.03 <br />$7.43 <br />Operating cost/hour: <br />$187.56 <br />NA <br />NA <br />NA <br />$34.94 <br />$11.12 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />$24.47 <br />$0.00 <br />Unit Subtotals: <br />$293.74 <br />NA <br />NA <br />NA <br />$101.43 <br />$18.55 <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$587.48 <br />Support: <br />$0.00 <br />Maint: <br />$119.98 <br />Total work team cost/hour: $707.46 <br />MATERIAL OUANTITIES <br />Initial volume: 17,100 CCY Swell factor: 1.125 <br />Loose volume: 19,238 LCY <br />Source of estimated volume: Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,550 lbs /LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />52,800 pounds <br />Payload Capacity: <br />20.71 LCY <br />LCY <br />Cycle Time: <br />Scraper Loading Time: <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />0.90 Minutes <br />CRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.