My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-04_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2015-02-04_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:14 PM
Creation date
2/4/2015 2:07:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
2/4/2015
Doc Name
Memo Regarding Bond Held Corrected & Cost Summary
From
Janet Binns
To
Rob Zuber
Type & Sequence
RN6
Email Name
JHB
RDZ
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 51 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$5,119.85 <br />Performance bond: <br />1.05% <br />Total = <br />$2,661.31 <br />Job superintendent: <br />352.85 hrs <br />Total = <br />$26,520.21 <br />Profit: <br />10.00% <br />Total = <br />$25,345.80 <br />TOTAL O & P = <br />$59,647.17 <br />CONTRACT AMOUNT (direct + O & P) = <br />$313,105.17 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and /or contract/bid preparation: <br />Reclamation management and /or administration: <br />500.00 <br />4.25% <br />5.00% <br />Total = <br />Total = <br />500.00 <br />$13,306.97 <br />$15,655.26 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $89,109.40 <br />TOTAL BOND AMOUNT (direct + indirect) = $342,567.40 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.