My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-02-04_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2015-02-04_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:57:14 PM
Creation date
2/4/2015 2:07:03 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
2/4/2015
Doc Name
Memo Regarding Bond Held Corrected & Cost Summary
From
Janet Binns
To
Rob Zuber
Type & Sequence
RN6
Email Name
JHB
RDZ
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maneuver and Spread Time: <br />Job Condition Correction: <br />0.60 Minutes <br />Page 4 of 51 <br />Site Altitude: 6100 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />NA <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />NA <br />(CAT HB) <br />Page 4 of 51 <br />Site Altitude: 6100 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />800.00 <br />5.00 <br />3.00 <br />8.00 <br />1381 <br />0.64 <br />Haul Time: 0.64 minutes <br />Return Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />800.00 <br />-5.00 <br />3.00 <br />-2.00 <br />2938 <br />0.34 <br />Return Time: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 912.10 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: <br />1 <br />Team(s) <br />Total job time <br />Unit cost: <br />$0.935 <br />/LCY <br />Total job cost <br />0.34 minutes <br />2.48 <br />minutes <br />757.04 <br />LCY/Hour <br />2 <br />Scraper(s) <br />757.04 <br />LCY/Hour <br />757.04 <br />LCY/Hour <br />25.41 Hours <br />$17 <br />CMCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.