2.3 Access Roads <br />All access roads are described in Section 1.3 of this mine plan. All trucks that leave the site for the <br />gravel operation will use Accesses 1, 4 or 6. All traffic supplying product demand to the south of <br />Alma will enter Highway 9 using Access 1 or 4 so that the traffic does not go through the town. <br />Every effort will be made to minimize the truck traffic through the town for all demand that exists to <br />the north. As described in Section 1.3, the roads will either be watered or sprayed with magnesium <br />chloride to keep dust down. These measures will be done on an as needed basis to ensure that dust is <br />kept to a minimum from the truck traffic. All trucks will also be covered as they leave the site and <br />will not track mud onto the Highway. <br />2.4 Topsoil Handling for Gravel Operation <br />As previously described, all disturbed area for the gravel portion of the disturbed area has been <br />previously disturbed with no topsoil salvaged. This area is 40.5 acres. The 110 area of 11.8 acres has <br />been regraded and will be reclaimed using fines from the stockpiles on site. Approximately 20,000 <br />cy has been salvaged from Ponds #1 - #4 as of January 2015 This has been placed in Fines Pile #1 <br />and #2, as shown on Map C -2. These piles will have slopes no steeper than 2.5H:1 V and will be <br />seeded according to the following mix: <br />Alma Placer Mine 1/15 34 <br />