Laserfiche WebLink
time. The post -mine map will not show the reclamation of these areas because a firm commitment <br />cannot be made but it is the intent of the Trust to do the work. <br />No blasting will take place in this operation. Any spills of fuel or other hazardous material will be <br />reported to the Division as soon as they are discovered. <br />The following table summarizes the acreage for the entire permit area. <br />Combined Permit Area Description <br />Gravel Operation <br />Gold Operation <br />Total <br />Acreage <br />Acreage <br />Acreage <br />1. Pre -Law Disturbed Area that will be <br />40.5 <br />36.5 <br />78.0 <br />re- disturbed and reclaimed if the opera- <br />tions complete the full plans shown in <br />this application <br />2. Pre Law Disturbance That May Be <br />11.0 <br />0.0 <br />11.0 <br />Reclaimed <br />2. New Disturbed Area <br />0.0 <br />48.0 <br />48.0 <br />3. Undisturbed Area <br />6.7 <br />72.4 <br />79.1 <br />4. Worst Case Disturbed Area <br />28.7 <br />34.1 <br />62.8 <br />Total Permit Area <br />216.10 <br />2.2. Sediment Control System Gravel Mining <br />The sediment control system for the gravel operation has been absorbed into the sediment control <br />system for the area north of Access #1 and is described in Section 1.2 of this Exhibit D. <br />Alma Placer 1/15 33 <br />