My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-16_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2015-01-16_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:40 PM
Creation date
1/23/2015 1:07:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
1/16/2015
Doc Name
4th Quarter 2014 Waste bank Inspection Report (Emailed)
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CWDA No. 3 <br />#01349 -0001 Huddlestou -Berry <br />01/14/15 ���' enfln- IMS&rr,W%. uc <br />l <br />Discussion of Vibrating Wire Piezometers <br />VWP -A Deep <br />VWP -A Deep was installed on October 6, 2014 near the northern edge of CWDA No. 3. VWP - <br />A Deep was installed in the foundation soil approximately eight feet below the bottom of the <br />gob. Since installation, the pore pressures recorded at VWP -A Deep have decreased. Due to the <br />limited time since installation, it is difficult to make any meaningful determinations regarding the <br />measured pore pressures and stability of the gob pile. However, the changes in pore pressure <br />have been fairly small and HBET does not believe that these changes are of sufficient magnitude <br />to cause any concern regarding the stability of the gob pile. <br />VWP A Shallow <br />VWP -A Shallow was installed on October 6, 2014 near the northern edge of CWDA No. 3. <br />VWP -A Shallow was installed approximately ten feet above the base of the gob. Since <br />installation, the pore pressures recorded at VWP -A Shallow have started to stabilize. Due to the <br />limited time since installation, it is difficult to make any meaningful determinations regarding the <br />measured pore pressures and stability of the gob pile. However, due to the fairly constant nature <br />of the readings, HBET does not have any concern regarding the measured pore pressures and <br />stability of the gob pile. <br />VWP -B Deep <br />VWP -B Deep was installed on October 6, 2014 in the west - central portion of CWDA No. 3. <br />VWP -B Deep was installed in the foundation soil approximately ten feet below the bottom of the <br />gob. Since installation, the pore pressures recorded at VWP -B Deep have been fairly constant. <br />Due to the limited time since installation, it is difficult to make any meaningful determinations <br />regarding the measured pore pressures and stability of the gob pile. However, due to the fairly <br />constant nature of the readings, HBET does not have any concern regarding the measured pore <br />pressures and stability of the gob pile. <br />VWP -B Shallow <br />VWP -B Shallow was installed on October 6, 2014 in the west - central portion of CWDA No. 3. <br />VWP -B Shallow was installed approximately ten feet above the base of the gob. Since <br />installation, the pore pressures recorded at VWP -B Shallow have decreased slightly and then <br />increased slightly. Due to the limited time since installation, it is difficult to make any <br />meaningful determinations regarding the measured pore pressures and stability of the gob pile. <br />However, the changes in pore pressure have been fairly small and HBET does not believe that <br />these changes are of sufficient magnitude to cause any concern regarding the stability of the gob <br />pile. <br />VWP -D <br />VWP -D was installed on October 7, 2014 in the east - central portion of CWDA No. 3. VWP -D <br />was installed approximately ten feet above the base of the gob. Since installation, the pore <br />pressures recorded at VWP -D have increased. Due to the limited time since installation, it is <br />difficult to make any meaningful determinations regarding the measured pore pressures and <br />stability of the gob pile. However, the changes in pore pressure have been fairly small and <br />HBET does not believe that these changes are of sufficient magnitude to cause any concern <br />regarding the stability of the gob pile. <br />X:\2008 ALL PROJECTS \01349 -Bowie Resources, LM01349 -0001 Bowie Mine\200 - Geo \Gob 3\lmtmn ntation Monitoring \01349 -0001 LR011315.doe 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.