My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-16_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2015-01-16_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:40 PM
Creation date
1/23/2015 1:07:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
1/16/2015
Doc Name
4th Quarter 2014 Waste bank Inspection Report (Emailed)
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huddleston -Berry <br />Engineering & Testing, LLC <br />T <br />Bowie Resources, LLC <br />43659 Bowie Road <br />Paonia, Colorado 81428 <br />Attention: Mr. Bill Bear <br />Subject: Summary of Instrumentation Monitoring <br />4th Quarter 2014 <br />Bowie Coal Waste Disposal Area No. 3 <br />Paonia, Colorado <br />Reference: <br />Dear Mr. Bear, <br />640 White Avenue, Unit B <br />Grand Junction, Colorado 81501 <br />Phone: 970-255-8005 <br />Fax: 970-255-6818 <br />HuddlestonBerry @Bresnan.net <br />January 14, 2015 <br />Project #01349 -0001 <br />Stability Evaluation, Gob Pile 93, Bowie No. 2 Mine by Huddleston -Berry <br />Engineering & Testing, LLC for Bowie Resources, LLC, July 15, 2014. <br />At the request of the Colorado Division of Reclamation, Mining and Safety (DRMS), <br />Huddleston -Berry Engineering & Testing, LLC (HBET) prepared this letter regarding quarterly <br />monitoring of vibrating wire piezometers at Coal Waste Disposal Area No. 3 (CWDA No. 3) at <br />the Bowie mine near Paonia, Colorado. The intent of the monitoring was to detect significant <br />changes in the pore water pressures within the coal waste which may impact the stability of the <br />waste pile. <br />Vibrating Wire Piezometers <br />Five vibrating wire piezometers were installed in CWDA No. 3 in October 2014. The <br />piezometers were installed at three locations within the footprint of the gob pile. Monitoring of <br />the functioning piezometers was completed by Buckhorn Geotech, Inc. (BGI) on November 26th <br />and December 18th, 2014. The attached monitoring report prepared by BGI includes the <br />piezometer monitoring data and the data is summarized in the following table. <br />VWP ID <br />Initial Pore <br />Pressure <br />10/31/14 <br />(psi) <br />11/26/14 Pore <br />Pressure <br />(psi) <br />12/18/14 Pore <br />Pressure <br />(psi) <br />Difference Since <br />Installation <br />(psi) <br />Difference Since <br />Last Reading <br />(psi) <br />VWP -A Deep <br />10.4 <br />9.4 <br />8.9 <br />-1.5 <br />-0.5 <br />VWP -A Shallow <br />4.7 <br />3.5 <br />3.5 <br />-1.2 <br />0.0 <br />VWP -B Deep <br />0.2 <br />0.1 <br />0 <br />-0.2 <br />-0.1 <br />VWP -B Shallow <br />13.9 <br />13.5 <br />14.0 <br />+0.1 <br />+0.5 <br />VWP -D <br />7.1 <br />8.4 <br />8.7 <br />+1.6 <br />+03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.