My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-16_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2015-01-16_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:40 PM
Creation date
1/23/2015 1:07:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
1/16/2015
Doc Name
4th Quarter 2014 Waste bank Inspection Report (Emailed)
From
J.E. Stover & Associates, Inc
To
DRMS
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CWDA No. 3 <br />401349 -0001 xuddiestnn- Perry <br />01/14/15 <br />Site Visit Observations <br />HBET visited the site on January 8, 2015. At the time of our visit, the northeastern portion of <br />CWDA No. 3 was being excavated down to the base of the disposal area. The excavated soil <br />was being moved to the cover soil stockpile areas on CWDA No. 2. Wet gob was being placed <br />in the drying area at the southeastern corner of CWDA No. 3. <br />HBET did not observe any groundwater in the bottom of the eastern disposal area at CWDA No. <br />3. In addition, no water was observed emanating from the underdrain below the center of <br />CWDA No. 3. No evidence of instability of other adverse conditions were observed at CWDA <br />No. 3. <br />General <br />In general, based upon the results of the recent VWP monitoring data and our observations at the <br />site, HBET does not believe that there is any reduction in the stability of CWDA No. 3. <br />Continued quarterly monitoring of piezometers is recommended. <br />We are pleased to be of service to your project. Please contact us if you have any questions or <br />comments regarding the contents of this report. <br />Respectfully Submitted: <br />Huddleston- Berik Engineering and Testing, LLC <br />39x0'10 <br />°rf �4 &`" <br />�-�- <br />Michael A. Berry, P.E. <br />Vice President of Engineering <br />X:12908 ALL PROIECTS191349 -Bowie Resources, LL001349 -0001 Bowie 41ine1200- Geo1Go6 'allnslrurnen[afian 4[onitoringl0} 349 -0001 LR011315.doc 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.