My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-23_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2015-01-23_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:17:23 AM
Creation date
1/23/2015 12:48:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
1/23/2015
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Annual Reclamation Report
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. -11- 2014 Annual Reclamation Report <br />Area - 1.6 acres <br />Date - March 2004 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase III Bond Release - 1.3 acres <br />28. Substations A - Superstructures, fences, slabs and components <br />removed during 2007. Graded to approximate original contours <br />and re- seeded. Phase I Bond Release was approved with SL -4 on <br />January 11, 2009. Located in the SE% Section 34, T10S, R98W, <br />6th P.M. <br />Area - 0.2 acres <br />Date - August 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />29. Roadside South Portal Mine Facilities and Stockpile /Prep Plant <br />Area and Conveyor Tunnel Under 1 -70 - The Roadside South <br />Portal Mine Facilities, Stockpile and Prep Plant areas where <br />reclaimed as per approved Permit Revision #3 (PR -3). 13.5 acres <br />were reclaimed during the last two quarters of 2007. These acres <br />include all back filled and graded areas along with buildings and <br />asphalt areas that were approved for retention through PR -3. The <br />east end of the Conveyor Tunnel was backfilled and filled with a 2 <br />foot concrete plug. Due to inclement weather and frozen soils, <br />seeding was postponed until the 1St quarter of 2008. Phase I Bor-d <br />Release was approved with SL -4 on January 11, 2009. These 13.5 <br />acres achieved final Phase II & III Bond Release with SL -6 which <br />was approved on December 14, 2010. Located in the SW'/ & SE% <br />Section 34, T10S, R98W, 6th P.M. <br />Area - 13.5 acres reclaimed <br />9.6 acres backfilled and graded <br />6.4 acres top soiled <br />Date - December 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />Phase III Bond Release - 13.5 acres <br />Pond 8 and surrounding area was backfilled, graded to final <br />contours and seeded in 2011. Located in the SW% & SE% Section <br />34, T10S, R98W, 6th P.M. <br />Area - 0.5 acres <br />Date - October 2011, October 2014 (re- seeded) <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components - 2011 <br />"Salt Tolerant Seed Mix, Table 14 -15" — 2014 <br />Pond 9 was backfilled, graded to final contours and seeded in <br />2013. Located in the SW% Section 34, T10S, R98W, 6th P.M. <br />Area - 0.4 acres <br />Date - April 2013 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />
The URL can be used to link to this page
Your browser does not support the video tag.