Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-12- 2014 Annual Reclamation Report <br />30. Roadside South Portal Road to Old Upper Diversion Ditch and <br />Water Tank (Light Use Road #1 ) - Portions of Light Use Road #1, <br />as approved by PR -3, was graded to approximate original contours <br />and seeded. Phase I Bond Release was approved with SL-4 on <br />January 11, 2009. Located in SE% Section 34, T10S, R98W, 6th <br />P.M. <br />Area - 1.9 acres <br />Date - September 2007 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />31. Railroad Loop Track (South of 19/10 Road) - The Railroad Loop <br />Track that lies south of 19/10 Road was removed, regraded, <br />backfilled and seeded. This area was part of the 2.1 acres that <br />achieved final Phase I, II & III Bond Release with SL -5, approved <br />on November 5, 2009. Located in the NW% Section 34, T10S, <br />R98W, 6th P.M. <br />Area - 0.3 acres <br />Date - January 2009 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase III Bond Release - 0.3 acres <br />32. Cameo Refuse Disposal Area No. 1 (Road) - The "access" road <br />(1.2 acres) to Cameo Refuse Disposal Area No. 1 that had been <br />left open for coal fines clean up was regraded and backfilled to <br />approved final contours and seeded. Located in the SE% Section <br />28, T10S, R98W, 6th P.M. <br />Area - 1.2 Acres <br />Date - September 2010 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />33. Unit Train Load -out and Railroad Loop Track/Conveyor <br />Corridor - Portions of the Unit Train Load -out and Railroad Loop <br />Track/Conveyor Corridor where reclaimed as per approved Permit <br />Revision #4 (PR -4). 38.1 acres were backfilled and graded during <br />2010. 0.9 acres, which includes reclaimed Ponds 1 and 2, footprint <br />of Topsoil Pile #4, and small area where coal fines where removed, <br />was seeded. The entire 67.6 acres at this area achieved final <br />Phase I, II & III Bond Release with SL -7 which was approved on <br />April 26, 2011. Located in Sections 26, 27 & 34 T10S, R98W, 6 th <br />P.M. <br />Area - 38.1 acres reclaimed, 0.9 acres seeded <br />Date - June & September 2010 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase III Bond Release - 67.6 acres <br />