My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-01-23_REPORT - C1981041
DRMS
>
Day Forward
>
Report
>
Coal
>
C1981041
>
2015-01-23_REPORT - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 10:17:23 AM
Creation date
1/23/2015 12:48:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Report
Doc Date
1/23/2015
From
J.E. Stover & Associates, Inc
To
DRMS
Annual Report Year
2014
Permit Index Doc Type
Annual Reclamation Report
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snowcap Coal Company, Inc. <br />-10- 2014 Annual Reclamation Report <br />23. Substations B - Superstructures, fences, slabs and components <br />removed during 2002. Graded to approximate original contours <br />and re- seeded. Phase I Bond Release was approved with SL -2 on <br />October 27, 2003. Located in the SWY4 Section 35, T10S, R98W, <br />6th P.M. <br />Area - 0.3 acres <br />Date - November 2002 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />24. 2 West Portals - Substation of portal areas. Reference Exhibit 58. <br />Phase I Bond Release was approved with SL -2 on October 27, <br />2003. Located in the NE %, Section 11, T11S, R98W, 6th P.M. <br />Area - 0.7 acres <br />Date - December 2001 <br />Seed Mix - "Seed Mix, Table 14 -6" <br />25. Cameo Refuse Disposal Area Topsoil Piles - These piles were <br />used for top soiling the CRDA2 during final reclamation activities. <br />Phase I Bond Release was approved with SL -2 on October 27, <br />2003. Located in the SE'/, Section 28, T1 OS, R98W, 6th P.M. <br />Area - 2.9 acres <br />Date - April 2002 <br />Seed Mix - "Seed Mix, Table 14 -13 ", Upland Components <br />26. Conveyor Corridor - The conveyor corridor, from the Xcel culvert <br />north to Haul Road #3 was graded to approximate original contours <br />and re- seeded. Phase I Bond Release was approved on 2.2 acres <br />with SL -2 on October 27, 2003 and on 0.5 acres with SL -5 on <br />November 5, 2009. The 0.5 acres achieved final Phase II & III <br />Bond Release with SL -5, approved on November 5, 2009 and the <br />2.2 acres achieved final Phase II & III Bond Release with SL -7, <br />approved on April 26, 2011. Located in SEY4, Section 27 and <br />NW %, Section 34, T1 OS, R98W, 6th P.M. <br />Area - 2.7 acres <br />Date - July 2003 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Lowland Components <br />Phase III Bond Release - 2.7 acres <br />27. Conveyor Corridor - The conveyor corridor, from the Xcel culvert <br />south to Transfer Building #2 and east of Colorado River where <br />conveyor tube crossed river was graded to approximate original <br />contours and seeded. Phase I Bond Release was approved on 0.6 <br />acres with SL -4 on January 11, 2009 and on 1.0 acres with SL -5 on <br />November 5, 2009. A total of 1.3 acres in this area achieved final <br />Phase II & III Bond Release with SL -5, approved on November 5, <br />2009. Located in SEY4, Section 27 and NW'/, Section 34, T1 OS, <br />R98W, 6th P.M. <br />
The URL can be used to link to this page
Your browser does not support the video tag.