Laserfiche WebLink
Ms. Richardson <br /> Page 7 <br /> January 12,2015 <br /> 6.4.12 Exhibit L—Reclamation Costs <br /> 35. The Applicant has provided a cost estimate for structures at the Ralston Quarry. In order to <br /> accurately estimate the cost to remove the structures the Applicant must provide the Division <br /> with the dimensions (of superstructure, foundation and footings)and type of material used to <br /> construct shop buildings, scales, asphalt plant, fuel tanks, conveyors and any other structures <br /> on site that will need to be demolished and removed during final reclamation of the site. <br /> 36. The Applicant has indicated an asphalt parking lot will need to be removed upon final <br /> reclamation of the site. Please specify the size of the parking lot and any other paved areas <br /> within the permit boundary which will need to be reclaimed. <br /> 37. The Division is currently reviewing the financial warranty calculation. The final bond <br /> calculation will be provided to the Applicant once all of the adequacy issues have been <br /> addressed. <br /> 6.4.13 Other Permits and Licenses <br /> 38. Please specify if approval is needed from the Office of the State Engineer prior to utilizing <br /> the reclaimed site as a water storage reservoir. <br /> 6.4.14 Exhibit N—Source of Legal Right to Enter <br /> No comment. <br /> 6.4.15 Exhibit O—Owner(s)of Record of Affected Land and Owners of Substance to be <br /> Mined <br /> No comment. <br /> 6.4.16 Exhibit P—Municipalities Within Two Miles <br /> No comment. <br /> 6.4.17 Exhibit Q—Proof of Mailing of Notices to Board of County Commissioners and Soil <br /> Conservation District <br /> No comment. <br /> 6.4.18 Exhibit R—Proof of Filing with County Clerk and Recorder <br /> No comment. <br />