2015-01-12_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:33 PM
Creation date
1/13/2015 9:38:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/12/2015
Doc Name
Weekly CQA Report: Weeks ending 12/13/14, 12/20/14, 12/27/14, 1/2/15.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amed <br /> channel)was placed and compacted as structural fill per project technical specification <br /> downslope of Bench M stations M34+00 to M42+00 in Phase 2. A Cat 330C excavator with a <br /> hammer attachment broke up oversized rock. <br /> Material hauled from the Surge area was placed and compacted as structural fill per project <br /> technical specifications between stations L0+00 to L8+00 on Bench L in Phase 1. A Cat 330C <br /> excavator with a hammer attachment broke up oversized rock. <br /> Slope grading occurred upslope of Bench H between stations H18+00 to H22+00 and below <br /> Bench L between stations L4+00 to L8+00 in Phase 1. <br /> Slope grading occurred above the SGVLF haul road using Cat dozers between stations 65+00 to <br /> 80+00 and below Bench N station N18+00 in Phase 2. <br /> Ames constructed an access ramp from the Surge area to the Phase 2 structural fill area on <br /> Bench M. <br /> Subgrade: Subgrade preparation is ongoing in the Phase 2 clearing and grubbing areas. <br /> Soil Liner Fill (SLF): (Placement Operations Temporarily Suspended) <br /> SLF was hauled from the Cameron Clay Pit area and stockpiled below Bench F between stations <br /> F0+00 and F10+00. <br /> Cameron Site: SLF processing continued periodically at the Cameron Site. <br /> Underdrain System: <br /> Primary Underdrain: Complete. <br /> Secondary Underdrain: No work was performed during this reporting period. <br /> Tertiary Underdrain: No work was performed during this reporting period. <br /> Leak Detection: No work was performed during this reporting period. <br /> B) Underground Workings: <br /> Anaconda Mine Complex: <br /> Twenty-four confirmatory borehole locations were drilled across the south end of the Anaconda <br /> Mine Complex connecting the west and east side of complex to the holes previously drilled in July <br /> 2014. No voids were encountered. All holes were then grouted. Additional remediation work is <br /> required. <br /> C) Geomembrane: <br /> Phase 1 80-mil DSMS LLDPE Liner Installation: (Installation is suspended at this time.) <br /> D) Drain Cover Fill (DCF) (Placement operations suspended at this time.) <br /> E) High Volume Solution Collection System Piping (HVSCS): <br /> No work was performed during this reporting period. <br /> II) Storm Water Management <br /> Best Management Practices (BMPs) are being performed. <br /> 2014-12-13-mIe2 weekly final Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.