Laserfiche WebLink
amei9 <br /> CRIPPLE CREEK &VICTOR GOLD MINING Co. <br /> ANGLOGOLD ASHANTI (COLORADO) <br /> SQUAW GULCH (VLF)WEEKLY REPORT <br /> Owner: Cripple Creek &Victor Gold Mining Co. Project Number: 74201125N0 <br /> Project: Squaw Gulch Valley Leach Fill (VLF) Week Ending: December 13, 2014 <br /> Location: Cripple Creek &Victor Gold Mine, CO <br /> Contractor: Ames Construction, Inc. <br /> Reporting Period: 12.7.2014 through 12.13.2014 <br /> Days S M T W T F S <br /> D D D D D <br /> Work Shifts <br /> N N N N N <br /> D=Day Shift N=Night Shift H= Holiday <br /> Ambient Temperature Ranges During Week Weather Conditions During Week: <br /> Highs: 30°F to 50°F Cloud Cover: Partly cloudy <br /> Lows: 16°F to 30°F Precipitation: None <br /> Wind: Variable <br /> Ames: Continuing construction tasks for the Valley Leach Facility(VLF). <br /> Planning: Continuing construction activities and scheduling for the VLF. <br /> CONSTRUCTION ACTIVITIES AND PROGRESS: <br /> I) Earthworks <br /> A) VLF (Phase 1, and 2) <br /> Topsoil/Overburden Stripping: <br /> Topsoil was removed from the Phase 2 Area between the riprap stockpile and the Phase 2 <br /> Diversion Channel. The topsoil was hauled to the Area 34 topsoil stockpile. <br /> Tree Grubbing and Clearing, Chipping: <br /> Tree removal occurred in the Phase 2 area between the riprap stockpile and the Phase 2 <br /> Diversion Channel. Timbers greater than 6 inches in diameter were hauled offsite for public use. <br /> Tree stumps (root balls)and slash were hauled and piled upslope of Phase 2 Diversion Channel <br /> near station 38+00. <br /> Production Drilling: None. <br /> Production Blasting: None. <br /> Structural Fill: <br /> An AMEC field professional monitored fill material temperatures during fill placement. Average <br /> structural fill temperatures were above 32°F. All construction materials placed were verified as <br /> suitable, and construction methods were in accordance with project technical specifications. <br /> Material hauled from Surge area (area located near the east end of the Phase 2 diversion <br /> 2014-12-13-mIe2 weekly final Page 1 of 6 <br />