Laserfiche WebLink
amen <br /> CQA ACTIVITIES: <br /> I) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement; SLF sampling; clearing and grubbing; underground working remediation, and <br /> topsoil removal. <br /> II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br /> continued. <br /> The following samples were collected and returned to AM EC's laboratory for analysis: <br /> • Soil Liner Fill Sample SLF-167C(Control sample) <br /> General Project Items <br /> Meetings and Discussions: <br /> • The Weekly Contractor Meeting was held December 10, 2014(AM EC, CC&V, Ames) <br /> • Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects,AMEC, and Ames. <br /> Miscellaneous: None. <br /> Deliveries: None. <br /> Submitted by: Eric Lorenson Date: December 16, 2014 <br /> Reviewed b�v� ' Date: December 16, 2014 <br /> Tim Burkhard <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Reviewed By: =• _ Date: //,-?/j <br /> Reviewed By: Date: /._2—/s- <br /> 2014-12-13-m1e2 weekly final Page 3 of 6 <br />