Laserfiche WebLink
BULLDOZER RIPPING WORK <br />Task description: Rip Stockpile Area, 4.4 acres, 500 ft length <br />Site: Buffalo No 1 Permit Action: TR -0 1 2014 Permit/Job #: M1978011 <br />PROJECT IDENTIFICATION <br />Task #: 004 State: Colorado Abbreviation: None <br />Date: 12/24/2014 County: Elbert Filename: MO 11-004 <br />User: AME <br />Seismic: <br />Area: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Ripper Attachment: 3 -Shank Ripper <br />Cost Breakdown: <br />Horsepower: 310 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Alternate Methods: <br />NA Bank Volume: NA BCY NA <br />4.40 acres Rip Depth (ft): <br />Source of estimated quantity: DRMS <br />HOURLY PRODUCTION <br />Seismic: <br />1.00 <br />Volume: 7,099 BCY or CCY <br />Seismic Velocity: <br />NA <br />Utilization % <br />Ownership Cost /Hour: <br />$69.05 <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />100 <br />Ripper Operating Cost/Hour: <br />$7.46 <br />100 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total Unit Cost/Hour: <br />$222.73 <br />feet <br />Total Fleet Cost/Hour: <br />$222.73 <br />feet <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />NA Bank Volume: NA BCY NA <br />4.40 acres Rip Depth (ft): <br />Source of estimated quantity: DRMS <br />HOURLY PRODUCTION <br />Seismic: <br />1.00 <br />Volume: 7,099 BCY or CCY <br />Seismic Velocity: <br />NA <br />feet/second <br />Area: <br />Average Ripping Depth: <br />2.56 <br />mph <br />Average Ripping Width: <br />7.08 <br />degrees <br />Average Ripping Length: <br />500.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.822 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.822 <br />Acres/hr <br />Site Altitude: <br />5,900 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.68 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.68 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />6.45 <br />Unit cost: $326.454 Per acre <br />Total job cost: <br />$1,431 <br />Hours <br />CIRCES Cost Estimating Software <br />