Laserfiche WebLink
Scraper Worksheet Cont'd <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />Task # 003 Page 2 of 2 <br />0.80 Minutes <br />0.60 Minutes <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Haul Route: <br />Site Altitude: 5900 feet <br />Seg # <br />Scraper <br />Push Dozer <br />Source <br />Altitude Ad': <br />1.000 <br />1.000 <br />CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced, watered, maintained 2.0 <br />Haul Route: <br />Site Altitude: 5900 feet <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />710.00 <br />-5.00 <br />2.00 <br />-3.00 <br />2972 <br />0.30 <br />Haul Time: 0.30 minutes <br />Return Route- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />(% ) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />710.00 <br />5.00 <br />2.00 <br />7.00 <br />2240 <br />0.43 <br />Return Time: <br />0.43 <br />minutes <br />Total Scraper team cycle time: <br />2.13 <br />minutes <br />Adjusted for job conditions: <br />678.03 <br />LCY /Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />1,356.06 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,356.06 <br />LCY/Hour <br />Unadjusted unit production/hour: 816.90 LCY /Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.764 /LCY <br />Total job time: 14.50 Hours <br />Total job cost: $15,019 <br />CIRCES Cost Estimating Software <br />