Laserfiche WebLink
Scraper Worksheet Cont'd Task # 005 Pagel of 2 <br />SCRAPER TEAM WORK <br />Task description: Spread Topsoil on (North) 4.4 acres, 6 inches <br />Site: Buffalo No 1 Permit Action: TR -0 1 2014 Permit /Job #: M1978011 <br />PROJECT IDENTIFICATION <br />Task #: 005 State: Colorado <br />Date: 12/24/2014 County: Elbert <br />User: AME <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 637G <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: M011 -005 <br />COSTShift basis: 1 per day <br />Cost Breakdown: Scraner Wnrk Team Srnnnnrt Fmiinment Maintenance Frniinment <br />Total work team cost/hour: $761.00 <br />MATERIAL OUANTITIES <br />Initial volume: 2,920 CCY Swell factor: 1.215 <br />Loose volume: 3,548 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$107.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$239.91 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$33.56 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$380.50 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$761.00 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $761.00 <br />MATERIAL OUANTITIES <br />Initial volume: 2,920 CCY Swell factor: 1.215 <br />Loose volume: 3,548 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />1,6001bs /LCY <br />Material description: <br />Top Soil <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />51.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />