Laserfiche WebLink
DIVISION 1- GENERAL REQUIREMENTS <br />SECTION 01160 - SITE CONDITIONS <br />PART 1- SITE INVESTIGATIONS AND REPRESENTATION <br />1.01 GENERAL <br />The Contractor acknowledges that he has satisfied himself as to the nature and location of the work, the general <br />and local conditions, particularly those bearing upon access to the site; handling, storage, and disposal of <br />materials; availability of water, electricity, and roads; uncertainties of weather, river stages, or similar physical <br />conditions at the site; the conformation and conditions of the ground; the equipment and facilities needed <br />preliminary to and during the execution of the work; and all other matters which can in any way affect the <br />work. <br />1.02 SITE CONDITIONS <br />The Contractor further acknowledges that he has satisfied himself as to the character, quality and quantity of <br />surface and subsurface materials to be encountered from his inspection of the site and from reviewing any <br />available records of exploratory work furnished by the Owner or included in these Documents. Failure by the <br />Contractor to acquaint himself with the physical conditions of the site and all the available information will not <br />relieve him from responsibility for properly estimating the difficulty or cost of successfully performing the <br />work. <br />1.03 WARRANTEE <br />The Contractor warrants that as a result of his examination and investigation of all the aforesaid data that he <br />can perform the work in a good and workmanlike manner. <br />PART 2 - INFORMATION ON SITE CONDITIONS <br />2.01 AVAILABILITY <br />Any information obtained by the Engineer regarding site conditions, subsurface information, groundwater <br />elevations, existing construction of site facilities, and similar data will be available for inspection, as <br />applicable, at the office of the Engineer upon request. Such information is offered as supplementary <br />information only. The Engineer does not assume responsibility for the completeness or interpretation of such <br />supplementary information. <br />A. Differing Subsurface Conditions <br />In the event that the subsurface or latent physical conditions are found materially different <br />from those indicated in these Documents, and differing materially from those ordinarily <br />encountered and generally recognized as inherent in the character of work covered in the <br />Plans and Specifications, the Contractor shall promptly, and before such conditions are <br />disturbed, notify the Engineer in writing of such changed conditions. <br />The Engineer will investigate such conditions promptly and following this investigation, the <br />Contractor shall proceed with the work, unless otherwise instructed by the Engineer. <br />Wattenberg Resource Pond 3 Slurry Wall Section 01160 — Site Investigations and Representation <br />Page 1 <br />