My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-24_REVISION - M2004051 (4)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2004051
>
2014-12-24_REVISION - M2004051 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:53 PM
Creation date
12/29/2014 8:17:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004051
IBM Index Class Name
REVISION
Doc Date
12/24/2014
Doc Name
TR Submittal- Slurry Wall
From
Aggregate Industries
To
DRMS
Type & Sequence
TR1
Email Name
TAK
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Underground Utilities <br />1. Known utilities and structures adjacent to or encountered in the work are shown on the <br />Drawings. The locations shown are taken from existing records and the best information <br />available from existing utility plans, however, it is expected that there may be some <br />discrepancies and omissions in the locations and quantities of utilities and structures <br />shown. Those shown are for the convenience of the Contractor only, and no <br />responsibility is assumed by the Engineer for their accuracy or completeness. The <br />Contractor is solely responsible for contacting appropriate agencies for utility locates. <br />PART 3 - CONTRACTOR'S RESPONSIBILITY FOR UTILITY PROPERTIES AND SERVICE <br />3.01 GENERAL <br />A. Where the Contractor's operations could cause damage or inconvenience to railway, telegraph, <br />telephone, television, oil, gas, electricity, water, sewer, or irrigation systems, the operations shall <br />be suspended until all arrangements necessary for the protection of these utilities and services have <br />been made by the Contractor. <br />B. Notify all utility offices which are affected by the construction operation at least 48 hours in <br />advance. Under no circumstances expose any utility without first obtaining permission from the <br />appropriate agency. Once permission has been granted, locate, expose, and provide temporary <br />support for all existing underground utilities. <br />C. The Contractor shall protect all utility poles from damage. If interfering power poles, telephone <br />poles, guy wires, or anchors are encountered, notify the Engineer and the appropriate utility <br />company at least 48 hours in advance of construction operations to permit the necessary <br />arrangements for protection or relocation of the interfering structure. <br />D. The Contractor shall be solely and directly responsible to the Owner and operators of such <br />properties for any damage, injury, expense, loss, inconvenience, delay, suits, actions, or claims of <br />any character brought because of any injuries or damage which may result from the construction <br />operations under this Contract. <br />E. The Owner and Engineer shall not be responsible to the Contractor for damages as a result of the <br />Contractor's failure to protect utilities encountered in the work. <br />F. If the Contractor while performing the Contract discovers utility facilities not identified in the <br />Drawings or Specifications, he shall immediately notify the utility, and the Engineer in writing. <br />G. In the event of interruption to domestic water, sewer, storm drain, or other utility services as a <br />result of accidental breakage due to construction operations, promptly notify the proper authority. <br />Cooperate with said authority in the restoration of service as promptly as possible and bear all <br />costs of repair. In no case shall interruption of any water or utility service be allowed to exist <br />outside working hours unless prior approval is granted. <br />H. The Contractor shall replace, at his own expense, any and all other existing utilities or structures <br />removed or damaged during construction, unless otherwise provided for in these Contract <br />Documents or ordered by the Engineer. <br />3.02 INTERFERING STRUCTURES <br />A. Take necessary precautions to prevent damage to existing structures whether on the surface, <br />aboveground, or underground. An attempt has been made to show major structures on the <br />Drawings. The completeness and accuracy cannot be guaranteed, and it is presented simply as a <br />guide to avoid known possible difficulties. <br />Wattenberg Resource Pond 3 Slurry Wall Section 01160 — Site Investigations and Representation <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.