Laserfiche WebLink
DIVISION 1- GENERAL REQUIREMENTS <br />SECTION 01100 - SPECIAL PROJECT PROCEDURES <br />PART1- GENERAL <br />All work required for this project is to be accomplished in accordance with the contract drawings and <br />specifications. <br />PART 2 - NOT APPLICABLE <br />PART 3 - EXECUTION <br />3.01 GENERAL <br />A. Construction Sequence <br />The Contractor shall submit a proposed construction sequence to the Engineer for approval. <br />B. Test Records <br />The Contractor shall maintain testing records on -site for review by the Engineer. <br />END OF SECTION <br />Wattenberg Resource Pond 3 Slurry Wall Section 01100 — Special Project Procedures <br />Page 1 <br />