Laserfiche WebLink
DIVISION 1- GENERAL REQUIREMENTS <br />SECTION 01050 - FIELD ENGINEERING <br />1.01 SURVEYING <br />The Owner will field establish horizontal and vertical control points. The Owner shall also provide offset <br />staking of the centerline slurry wall alignment. <br />1.02 SUPERVISION <br />The contractor shall have supervision, be knowledgeable of the project requirements and proper installation <br />and construction procedures, and be available in the field at all times that work is progressing. <br />END OF SECTION <br />Wattenberg Resource Pond 3 Slurry Wall Section 01050 — Field Engineering <br />Page 1 <br />