Laserfiche WebLink
DIVISION 1- GENERAL REQUIREMENTS <br />SECTION 01040 - COORDINATION <br />1.01 PROJECT COORDINATION <br />Contractor shall provide the Engineer with a construction schedule, updated as needed during construction, <br />to assist the Engineer in providing field related engineering services in a timely fashion. <br />1.02 JOB SITE ADMINISTRATION <br />If the Owner accepts bid Alternate A, the Contractor will provide quality control meeting the requirement <br />of Section 02168. If the Owner does not accept bid Alternate A, the Engineer shall establish a quality <br />control system as outlined in Section 02168. The Engineer shall establish a quality assurance program. <br />The Contractor shall be responsible that the cutoff wall meets the design criteria for the lining of gravel pits <br />per Office of the State Engineer. <br />END OF SECTION <br />Wattenberg Resource Pond 3 Slurry Wall Section 01040 — Coordination <br />Page I <br />