3. Rejected loads of material, including material rejected after it has been placed by reason <br />of failure of Contractor to conform to provisions of Contract Documents. <br />4. Material not unloaded from transporting vehicle. <br />5. Defective Work not accepted by Engineer. <br />6. Material remaining on hand after completion of Work. <br />END OF SECTION <br />Wattenberg Resource Pond 3 Slurry Wall Section 01025 — Measurement and Payment <br />Page 3 <br />