My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-12_REVISION - C2010089 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-12-12_REVISION - C2010089 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:58 PM
Creation date
12/18/2014 2:10:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/12/2014
Doc Name
Cost Estimate
Type & Sequence
MT1
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9of 151 <br />Haul Route: <br />Travel <br />Seg #Haul Distance Grade (%)Roll. Res Total Res Velocity <br />Time <br />(Ft)(%)(%)(fpm) <br />(min) <br />15000.000.003.003.0024092.512 <br />Haul Time:2.512minutes <br />Return Route: <br />Travel <br />Seg #Haul Distance Grade (%)Roll. Res Total Res Velocity <br />Time <br />(Ft)(%)(%)(fpm) <br />(min) <br />15000.000.003.003.0035031.699 <br />Return Time:1.699minutes <br />Total Truck Cycle Time:8.491minutes <br />Loading Tool unit <br />Production1,363.64LCY/HourAdjusted for job efficiency:1,131.82LCY/Hour <br />Truck Unit Production <br />494.64LCY/HourAdjusted for job efficiency:410.55LCY/Hour <br />Optimal No. of Trucks:3Truck(s)Selected Number of Trucks:3Truck(s) <br />Adjusted hourly truck team production:1,231.66LCY/Hour <br />Adjusted single truck/loader team production:1,131.82LCY/Hour <br />Adjusted multiple truck/loader team production:1,131.82LCY/Hour <br />JOB TIME AND COST <br />Fleet size:1Team(s)Total job time:795.18Hours <br />Unit cost:$1.890/LCYTotal job cost:$1,700,740 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.