My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-12_REVISION - C2010089 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-12-12_REVISION - C2010089 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:58 PM
Creation date
12/18/2014 2:10:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/12/2014
Doc Name
Cost Estimate
Type & Sequence
MT1
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8of 151 <br />Truck Bed (volume) Basis: <br />Struck Volume:60.60LCY <br />Heaped Volume:78.80LCY <br />Average Volume:69.70LCY <br />Adjusted Volume:78.43LCY <br />Final Truck Volume Based on Number of Loader Passes:70.00LCY <br />Loading Tool Capacity <br />Bucket Size Class:NA <br />Rated Capacity:16.000LCY (heaped) <br />Bucket Fill Factor:0.875Blasted rock -well blasted (80 -95%) 0.875 <br />Adjusted Capacity:14.000LCY <br />Job Condition Corrections: <br />Site Altitude (ft.): 5000feet <br />TruckLoaderSource <br />Altitude Adj:1.0001.000(CAT HB) <br />Job Efficiency:0.8300.830(CAT HB) <br />Net Correction:0.8300.830 <br />Loading Tool Cycle Time: <br />Number of Loading Tool Passes Required to Fill passes <br />5 <br />Truck: <br />Excavators and Front Shovels: <br />Machine Cycle Time vs. Job Condition Rating:NA <br />Selected Value within this Basic Rating:NA <br />Track Loaders –Material Description: <br />Cycle Time Elements (min.): <br />Load:NAManeuver:NADump:0.100 <br />Wheel and Track Loaders -Unadjusted Basic Loader Cycle Time (load, dump, maneuver):0.625minutes <br />Cycle Time FactorsFactor (min.)Source <br />Material:Material 3/4” to 6” diameter 0.000.000(Cat HB) <br />Stockpile:Conveyor or dozer piled 10 ft. high and up 0.000.000(Cat HB) <br />Truck Ownership:Common ownership of trucks and loaders -0.04-0.040(Cat HB) <br />Operation:Constant operation -0.04-0.040(Cat HB) <br />Dump Target:Nominal target 0.000.000(Cat HB) <br />Net Cycle Time Adjustment:-0.080minutes <br />Adjusted Loader Cycle Time:0.545minutes <br />Net Load Time per Truck:2.280minutes <br />Truck Cycle Time: <br />Truck Exchange Time:0.80MinutesAdjusted for site altitude:0.800Minutes <br />Truck Load Time:2.280MinutesAdjusted for site altitude:2.280Minutes <br />Truck Maneuver and Dump Time:1.20MinutesAdjusted for site altitude:1.200Minutes <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.