Laserfiche WebLink
Page 7of 151 <br />TRUCK/LOADER TEAM WORK <br />Task description:Backfill Final Pit with Overburden Stockpile <br />Permit Action:2014 Midterm Review <br />Site:New Horizon North Mine(MT-1)Permit/Job#:C2010089 <br />PROJECT IDENTIFICATION <br />Task #:002State:ColoradoAbbreviation:None <br />Date:12/12/2014County:MontroseFilename:C089-002 <br />User:SLB <br />: <br />Agency or organization nameDRMS <br />HOURLY EQUIPMENT COST <br />Shift basis: 1 per day <br />Equipment Description <br />Truck Loader Team -Truck:Cat 777F <br />-Loader:CAT 992K <br />Support Equipment -Load Area:Cat D11R -11U <br />-Dump Area:NA <br />Road Maintenance –Motor Grader:CAT 14M <br />-Water Truck:Water Tanker, 10,000 Gal. <br />Cost Breakdown: <br />Truck/Loader TeamSupport EquipmentMaintenance Equipment <br />Water Truck <br />TruckLoaderLoad AreaDump AreaMotor Grader <br />%Utilization-machine:100100100NA3535 <br />Ownership cost/hour: $112.38$174.83$173.50NA$42.03$52.28 <br />Operating cost/hour:$187.22$210.17$308.78NA$24.46$43.08 <br />Ripper op. cost/hour:NA$0.00$0.00NA$0.00$0.00 <br />Operator cost/hour:$27.80$37.13$38.01NA$24.47$27.88 <br />Unit Subtotals:$327.40$422.12$520.29NA$90.95$123.25 <br />Number of Units:311011 <br />Group Subtotals:Work:$1,404.32Support:$520.29Maint:$214.20 <br />$2,138.81 <br />Total work team cost/hour: <br />MATERIAL QUANTITIES <br />Initial volume:900,000CCYSwell factor:1.000 <br />Loose volume:900,000LCY <br />Source of estimated volume:Map 2.05.2-1 <br />Source of estimated swell factor:Cat Handbook <br />Material Purchase Cost:$0.00 <br />Total Cost:$0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight:2,550Pounds/LCY <br />Description:Sandstone <br />Rated Payload:200,000Pounds <br />Payload Capacity:78.43LCY <br />CIRCES Cost Estimating Software <br />