My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-12_REVISION - C2010089 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-12-12_REVISION - C2010089 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:58 PM
Creation date
12/18/2014 2:10:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/12/2014
Doc Name
Cost Estimate
Type & Sequence
MT1
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10of 151 <br />BULLDOZER WORK <br />Task description:Regrade Trailing Spoil Ridges <br />Permit Action:2014 Midterm Review <br />Site:New Horizon North Mine(MT-1)Permit/Job#:C2010089 <br />PROJECT IDENTIFICATION <br />Task #:003State:ColoradoAbbreviation:None <br />Date:12/12/2014County:MontroseFilename:C089-003 <br />User:SLB <br />:DRMS <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />:Cat D11R -11U <br />Basic Machine <br />Horsepower:850 <br />Blade Type:Universal <br />Attachment:NA <br />Shift Basis:1 per day <br />Data Source:(CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour:$173.50NA <br />Operating Cost/Hour:$308.78100 <br />Ripper op. Cost/Hour:$0.000 <br />Operator Cost/Hour:$38.01 <br />NA <br />Total unit Cost/Hour:$520.29 <br />Total Fleet Cost/Hour:$1,040.57 <br />MATERIAL QUANTITIES <br />Initial Volume:2,750,000 <br />Swell factor:1.000 <br />2,750,000 <br />Loose volume:LCY <br />Source of estimated volume:Map 2.05.2-1; Section 2.05.4(2)(c) <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance:300 feet <br />Unadjusted hourly 1,055.6 LCY/hr <br />production: <br />Materials consistency description:Partly consolidated stockpile 1.1 <br />Average push gradient:-25 % <br />Average site altitude:5,000 feet <br />Material weight:2,550 lbs/LCY <br />Weight description:Sandstone <br />Job Condition Correction Factor Source <br />Operator Skill:0.750(AVG.) <br />Material consistency:1.100(CAT HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.