My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-12_REVISION - C2010089 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-12-12_REVISION - C2010089 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:58 PM
Creation date
12/18/2014 2:10:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/12/2014
Doc Name
Cost Estimate
Type & Sequence
MT1
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 11of 151 <br />Dozing method:1.100(50% SL) <br />Visibility:1.000(AVG.) <br />Job efficiency:0.830(1 SHIFT/DAY) <br />Spoil pile:1.000(DOZ-OC) <br />Push gradient:1.516(CAT HB) <br />Altitude:1.000(CAT HB) <br />Material Weight:0.902(CAT HB) <br />Blade type:1.000(PAT) <br />Net correction:1.0300 <br />Adjusted unit production:1,087.27 LCY/hr <br />2174.54 <br />Adjusted fleet production:LCY/hr <br />JOB TIME AND COST <br />Fleet size:2 Dozer(s) <br />Unit cost:$0.479/LCY <br />1,264.64 <br />Total job time:Hours <br />Total job cost:$1,315,945 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.