My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-12_REVISION - C2010089 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-12-12_REVISION - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:58 PM
Creation date
12/18/2014 10:56:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/12/2014
Doc Name
Review Comments
From
Susan Burgmaier
To
Brock Bowles
Type & Sequence
MT1
Email Name
SLB
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 10 of 151 <br />BULLDOZER WORK <br />Task description: Regrade Trailing Spoil Ridges <br />Permit Action: 2014 Midterm Review <br />Site: New Horizon North Mine (MT -1) Permit/Job #: C2010089 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 12/12/2014 County: Montrose <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat DI IR - I IU <br />Horsepower: <br />850 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Abbreviation: None <br />Filename: C089 -003 <br />Total unit Cost/Hour: $520.29 <br />Total Fleet Cost/Hour: $1,040.57 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$173.50 <br />NA <br />Operating Cost/Hour: <br />$308.78 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $520.29 <br />Total Fleet Cost/Hour: $1,040.57 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />2,750,000 <br />Swell factor: <br />1.000 <br />Loose volume: <br />2,750,000 LCY <br />Source of estimated volume: Map 2.05.2 -1; Section 2.05.4(2)(c) <br />Source of estimated swell Cat Handbook <br />factor <br />HOURLY PRODUCTION <br />Average push distance: 300 feet <br />Unadjusted hourly 1,055.6 LCY /hr <br />production: <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -25% <br />Average site altitude: 5,000 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Sandstone <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.100 (CAT HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.