My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-12_REVISION - C2010089 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2010089
>
2014-12-12_REVISION - C2010089 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:58 PM
Creation date
12/18/2014 10:56:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
Revision
Doc Date
12/12/2014
Doc Name
Review Comments
From
Susan Burgmaier
To
Brock Bowles
Type & Sequence
MT1
Email Name
SLB
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 9 of 151 <br />Haul Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />494.64 <br />( %) <br />( %) <br />(fpm) <br />Time <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,231.66 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,131.82 <br />(min) <br />1 <br />5000.00 <br />0.00 <br />3.00 <br />3.00 <br />2409 <br />2.512 <br />Haul Time: 2.512 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />494.64 <br />( %) <br />( %) <br />(fpm) <br />Time <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,231.66 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,131.82 <br />min <br />1 <br />5000.00 <br />0.00 <br />3.00 <br />3.00 <br />3503 <br />1.699 <br />Return Time: <br />Total Truck Cycle Time: <br />1.699 <br />8.491 <br />minutes <br />minutes <br />Loading Tool unit <br />Production 1,363.64 <br />LCY/Hour Adjusted for job efficiency: <br />1,131.82 LCY/Hour <br />Truck Unit Production <br />494.64 <br />LCY/Hour Adjusted for job efficiency: <br />410.55 LCY/Hour <br />Optimal No. of Trucks: 3 <br />Truck(s) Selected Number of Trucks: <br />3 Truck(s) <br />Adjusted hourly truck team production: 1,231.66 <br />LCY/Hour <br />Adjusted single truck/loader team production: 1,131.82 <br />LCY/Hour <br />Adjusted multiple truck/loader team production: 1,131.82 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 <br />Team(s) Total job time: 795.18 <br />Hours <br />Unit cost: $1.890 /LCY <br />Total job cost: $1,700,740 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.