Laserfiche WebLink
Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.100 <br />(50% SL) <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />1.000 <br />(DOZ -OC) <br />1.516 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.902 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 1.0300 <br />Adjusted unit production: <br />Adjusted fleet production: <br />JOB TIME AND COST <br />1,087.27 LCY /hr <br />2174.54 LCY/hr <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.479/LCY <br />Total job time: 1,264.64 Hours <br />Total job cost: $1,315,945 <br />Page 11 of 151 <br />CIRCES Cost Estimating Software <br />