My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-15_REPORT - M1980244 (9)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-12-15_REPORT - M1980244 (9)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:56:00 PM
Creation date
12/16/2014 7:40:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/15/2014
Doc Name
Weekly CQA Report: Week ending 12/6/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br /> E) High Volume Solution Collection System Piping (HVSCS): <br /> No work was performed during this reporting period. <br /> II) Storm Water Management <br /> Best Management Practices(BMPs)are being performed. <br /> CQA ACTIVITIES: <br /> 1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br /> and fill placement, SLF sampling, clearing and grubbing; underground working remediation. topso I <br /> removal, Phase 1 geomembrane inspection, and leak detection access road construction. <br /> II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory tes`ing <br /> continued. <br /> The following samples were collected and returned to AMEC's laboratory for analysis: <br /> Drain Cover Fill Sample DCF-119C (Control sample) <br /> General Proiect Items <br /> Meetings and Discussions: <br /> The Weekly Contractor Meeting was held December 3, 2014 (AMEC, CC&V, Ames) <br /> r Ames daily safety meetings <br /> Summary of Concerns: None. <br /> CC&V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC&V <br /> Projects, AMEC, and Ames. <br /> Miscellaneous: <br /> A trench was excavated across the temporary haul road at approximate station 2+00 for temporary <br /> culvert placement in the Phase 2 Diversion Channel alignment to allow for drainage to the Phase <br /> Pond. HDPE culvert piping was installed and then the trench was backfilled. <br /> Silt fencing was installed on Bench A between approximate stations A11+00 to A15+00. <br /> Deliveries: None. <br /> Submitted by: Eric Lorenson Date: December 8, 2014 _ <br /> 1 <br /> Reviewed by: ` Date: December 8, 2014 _ <br /> Tim Burkhard- <br /> Project Resident <br /> Phone: 719-689-2986 <br /> CC&V Projects <br /> Reviewed By: Date: IZ17! Zo r`- - <br /> Reviewed By: J�� �%Z�11Tr � Date: <br /> 201412-6-MLE2 WEEKLY FINAL Page 3('6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.