Laserfiche WebLink
AM <br /> ame& <br /> ATTACHMENT A <br /> AMEC -2014 CQA Field Staff Schedule MLE2 <br /> Name Sun. Mon. Tues. Wed. Thurs. Fri. Sat. <br /> Nov. 30 Dec. 1 Dec. 2 Dec. 3 Dec. 4 Dec. 5 Dec. 6 <br /> Tim Burkhard PR PR PR PR PR <br /> Steve Rice UG UG UG UG <br /> Robert Redd UG UG UG UG UG <br /> Tyler Browning GT GT GT GT <br /> Eric Lorenson ST ST ST ST <br /> Denis Koval ST ST ST ST <br /> Al Frias ST ST ST ST ST <br /> Rick Buxton ST ST ST <br /> Razi Molloy LT LT LT LT LT <br /> Andrea Meduna PM <br /> LEGEND: <br /> PL = Project Lead <br /> PM = Project Manager <br /> PCE = Project Certifying Engineer <br /> PE = Project Engineer <br /> PR = Project Resident <br /> LG = Lead Geosynthetics Engineer <br /> LS = Lead Soils Technician <br /> ST = Soil Technician <br /> LT= Laboratory Technician <br /> GL = Geosynthetics Lead <br /> GT = Geosynthetics Technician <br /> FLM= Field/Laboratory Manager <br /> UG = Underground Working Remediation <br /> SE = Senior Engineer <br /> GS = Geophysics Survey Geologist <br /> HY= Highway Design Engineer <br /> 2014-12-6-MLE2 WEEKLY FINAL Page 4 of 6 <br />