My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_GENERAL DOCUMENTS - P2011030
>
Day Forward
>
General Documents
>
Prospect
>
P2011030
>
2014-11-25_GENERAL DOCUMENTS - P2011030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:36 PM
Creation date
12/12/2014 7:49:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011030
IBM Index Class Name
General Documents
Doc Date
11/25/2014
Doc Name
Updated NOI Reclamation Cost Packet.
From
DRMS
To
Fortune Revenue Silver Mines
Permit Index Doc Type
General Correspondence
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont'd Task#OIA Page I of 2 <br /> BULLDOZER WORK <br /> Task description: Recontour and grade drill pads <br /> Site: Revenue Mine Exploration _ Permit Action: 2014 Review Permit/Job#: P2011030 <br /> PROJECT IDENTIFICATION <br /> Task#: OIA State: _Colorado Abbreviation: None _ <br /> Date: 11/24/2014 County: Ouray Filename: P030-01A <br /> User: RCO <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D6T LGP <br /> Horsepower: 200 <br /> Blade Type: Straight _ <br /> Attachment: 3-shank ripper <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $38.47 NA <br /> Operating Cost/Hour: $67.16 100 <br /> Ripper op.Cost/Hour: $0.00 100 _ <br /> Operator Cost/Hour: $38.01 NA <br /> Total unit Cost/Hour: 0 <br /> Total Fleet Cost/Hour: $143.63 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 250 <br /> Swell factor: 1.335 <br /> Loose volume: 334 LCY <br /> Source of estimated volume: Division of Reclamation,Mining&Safety <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Average push distance: 80 feet <br /> Unadjusted hourly production: 346.4 LCY/hr <br /> Materials consistency description: Rock,avg.ripped or blasted 0.7 <br /> Average push gradient: 0% <br /> Average site altitude: 10,650 feet <br /> Material weight: 2,550 lbs/LCY <br /> Weight description: Sandstone <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.750 AVG. <br /> Material consistency: 0.700 CAT HB <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.