My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_GENERAL DOCUMENTS - P2011030
DRMS
>
Day Forward
>
General Documents
>
Prospect
>
P2011030
>
2014-11-25_GENERAL DOCUMENTS - P2011030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:36 PM
Creation date
12/12/2014 7:49:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011030
IBM Index Class Name
General Documents
Doc Date
11/25/2014
Doc Name
Updated NOI Reclamation Cost Packet.
From
DRMS
To
Fortune Revenue Silver Mines
Permit Index Doc Type
General Correspondence
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Cost update <br /> Site: Revenue Mine Exploration Permit Action: 2014 Review Permit/Job#: P2011030 <br /> PROJECT IDENTIFICATION <br /> Task#: OOA State: Colorado Abbreviation: None <br /> Da e: 11/24/2014 County: Ouray_ Filename: P030-00A <br /> ser: RCO ---- <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> OIA Recontour and grade drill pads DOZER ! 1 3.73 $535.00 <br /> 02A Recontour drill road and pads EXCAVATE 1 1.64 $171.00 <br /> 03A Reve etate drill pads and roads REVEGE 1 6.00 $204.00 <br /> 04A Haul reclamation equipment to and from site MOBILIZE 1 7.14 $2,726.00 <br /> SUBTOTALS: 18.51 $3,636 <br /> INDLRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02% Total= $73.45 <br /> Performance bond: 1.05% Total= $38.18 <br /> Job superintendent: 0.00 hrs Total= $0.00 <br /> Profit: 10.00% Total= $363.60 <br /> TOTAL O&P= $475.23 <br /> CONTRACT AMOUNT(direct+O&P)= $4,111.23 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): 500.00 Total= 500.00 <br /> Engineering work and/or contract/bid preparation: 0.00% Total= $0.00 _ <br /> Reclamation management and/or administration: 5.00% $205.56 <br /> CONTINGENCY: 0.00 Total= $0.00 <br /> TOTAL INDIRECT COST= $1,180.79 <br /> TOTAL BOND AMOUNT(direct+indirect)= $4,816.79 <br /> 4-;,Dk,nS <br /> VI ,l✓ Ale <br />
The URL can be used to link to this page
Your browser does not support the video tag.