Laserfiche WebLink
Bulldozer Worksheet Cont'd Task#OlA Page 2 of <br /> Spoil pile: 0.700 (FND-MF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: _ 0.940 (CAT HB) <br /> Material Weight: 0.902 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 0.2586 <br /> Adjusted unit production: 89.58 LCY/hr _ <br /> Adjusted fleet production: 89.58 LCY/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Dozer(s) <br /> Unit cost: $1.603/LCY <br /> Total job time: 3.73 Hours <br /> Total job cost: $535 <br />