Laserfiche WebLink
William A. Bear <br />Page 2 of 5 <br />December 9, 2014 <br />c. Item resolved; BRL provided the design information as requested. <br />d. Item resolved; BRL removed the "F: culverts from the summary on page Exh -8 -31, as <br />requested. <br />e. Item resolved; BRL will submit the design information under a revision to incorporate <br />the Gob Pile #2 borrow areas no later than January 15, 2015. <br />f. Item resolved; BRL verified and corrected the flow values reported for Ditch H1, Ditch <br />H2 and Culvert H1 and restored the label for Ditch H1 on Map 21 -3. <br />9. The Division's requested design information or clarification that certain structures are not <br />mine related. After reviewing BRL's November 18, 2014 response, we have the following <br />comments: <br />• 18" culvert near pond diversion structure along main haul road - in our October 9, <br />2014 review letter, we did not clarify which culvert was in question. The culvert in <br />question carries runoff under the haul road to divert flow from the Pond C drainage <br />to the Pond B drainage. Below is an excerpt of Map 21 -3, depicting the culvert in <br />question: <br />no <br />e • "� e <br />1 � <br />1 <br />8 <br />Please provide design information for the 18" culvert located near the Pond <br />8 /Pond C diversion structure, or direct the Division to the location of a currently <br />approved design in the permit application package. <br />• Item resolved; BRL updated Map 21 -2 and page EXH -8 -31 as requested. <br />