Laserfiche WebLink
. B. Earthwork <br /> 1. Backfilling $4,200.00 <br /> 2. Revegetation. $1,924.35 <br /> XIX Coal Handling Conveyor At k5 Portal <br /> A. Structure Removal <br /> 1. Conveyor Demolition $3,139.95 <br /> 2. Conveyor Disposal $979.20 <br /> 3. Footing Demolition. $625.00 <br /> 4. Footing Disposal. .$31.90 <br /> XX Reclaim Tunnel, Stacker Tube, and Fill <br /> A. Structure Removal <br /> 1. Reclaim Tunnel Demolition .$54,000.00 <br /> 2. Reclaim Tunnel Disposal $725.00 <br />• 3. Stacker Tube Demolition $6,784.00 <br /> 4. Stacker Tube Disposal .$89.90 <br /> 5. Surge Bin $1,585.35 <br /> B. Earthwork <br /> 1. Fill. .$46,560.00 <br /> 2. Spreading Fill. .$10,080.00 <br />as 3, 3Co l <br /> <br />viii <br />